The CSI Form 13.1A is designed for use after the bidding or negotiating phase of a project, allowing for a formal request to substitute one product for another as specified in the construction documents. This form entails thorough documentation including the proposed substitution's manufacturer, a comparative analysis with the specified product, and any potential impact on the project's timeline or costs. Completing and submitting this form is a crucial step in ensuring that any alterations to the original specifications are formally acknowledged and approved.

To begin the process of requesting a substitution on your project, click the button below.

Get Form

Understanding the complexities of construction projects can be daunting, especially when changes become necessary after the bidding or negotiating phase. The CSI 13 1A form serves a pivotal role in facilitating these changes, ensuring a streamlined process for requesting substitutions. This form, often integral to the efficiency and cost-effectiveness of a project, requires meticulous completion to detail the proposed substitution, including the product's manufacturer, model number, and the installer's contact information. It also demands a clear explanation for the substitution, accompanied by comparative data and the reason why the initially specified item cannot be provided. The form prompts for an assessment of how this change might affect other aspects of the project, any potential savings for the owner, and whether the substitution will alter the project's timeline. With slots for documenting the product's history, detailing similar installations, and stipulating the required supporting data, such as drawings, product data, and test reports, the form is designed to ensure that all stakeholders have comprehensive information to make informed decisions. This careful approach underscores the importance of precision and clarity in project management, demonstrating the CSI 13 1A form's role in maintaining project integrity when deviations from the original plan are necessary.

Preview - Csi 13 1A Form

SUBSTITUTION

REQUEST

(After the Bidding/Negotiating Phase)

Project:

 

Substitution Request Number:

 

 

 

 

From:

 

To:

 

Date:

 

 

 

 

A/E Project Number:

 

Re:

 

Contract For:

 

 

 

 

 

 

 

 

Specification Title:

 

 

 

 

 

Description:

 

Section:

Page:

Article/Paragraph:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Proposed Substitution:

 

 

 

 

 

 

 

 

 

 

 

 

Manufacturer:

 

 

 

Address:

 

 

 

Phone:

 

 

Trade Name:

 

 

 

 

 

 

 

 

Model No.:

 

 

Installer:

 

 

Address:

 

 

Phone:

 

History: ☐ New product

1-4 years old ☐ 5-10 years old

☐ More than 10 years old

 

Differences between proposed substitution and specified product:

Point-by-point comparative data attached — REQUIRED BY A/E

Reason for not providing specified item:

Similar Installation:

 

 

 

 

 

Project:

 

 

 

Architect:

 

Address:

 

 

 

Owner:

 

 

 

 

 

 

Date Installed:

 

Proposed substitution affects other parts of Work:

☐ No

☐ Yes; explain

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Savings to Owner for accepting substitution:

 

 

 

 

 

($

 

).

 

 

 

 

 

 

 

 

 

 

 

 

Proposed substitution changes Contract Time:

☐ No

☐ Yes [Add]

[Deduct]

 

 

 

 

 

days.

 

 

 

 

 

 

 

 

 

 

 

 

Supporting Data Attached: ☐Drawings

☐Product Data

☐ Samples

☐ Tests

☐ Reports

 

 

 

 

 

 

 

 

 

 

 

 

© Copyright 2013, CSI,

Page ___ of ___

Form Version: September 2013

110 S. Union St., Suite 100, Alexandria, VA 22314

 

CSI Form 13.1A

Document Specs

Fact Name Description
Form Purpose The CSI 13 1A form is used for submitting a substitution request after the bidding or negotiating phase of a project.
Information Required The form requires details such as project, substitution request number, dates, contractor/vendor details, product description, and reasons for substitution.
Product History Options It categorizes the product's history into new, 1-4 years old, 5-10 years old, or more than 10 years old.
Supporting Documentation Supporting documents like drawings, product data, samples, tests, and reports can be attached as part of the substitution request.
Comparative Data Requirement Submitters are required to provide point-by-point comparative data between the proposed substitution and the specified product.
Impact Analysis The form asks if the proposed substitution affects other parts of work, and if it changes the contract time, with space to explain.
Financial Considerations Details about cost savings to the owner by accepting the proposed substitution request are included.
Governing Law and Location The CSI 13 1A form is governed by its usage in specific projects and may align with local or state-specific laws where applicable; it originates from Alexandria, VA.

Instructions on Writing Csi 13 1A

Completing the CSI 13 1A form is a structured process designed for clarity and efficiency. This form is essential for anyone requesting the substitution of a product or material after the bidding or negotiating phase of a project. The steps outlined below are intended to ensure that every necessary detail concerning the substitution request is accurately conveyed. Proper completion of this form facilitates a smoother approval process, allowing project stakeholders to assess the proposed change effectively.

  1. Begin by filling in the Project name at the top of the form, specifying the name or identifier of the overall project under consideration.
  2. Enter the Substitution Request Number. This should be a unique identifier for this specific substitution request to keep track of it easily.
  3. Provide your details in the From field to indicate who is making the request.
  4. Specify the recipient of the request in the To field.
  5. Record the Date of the submission for the record.
  6. Input the A/E Project Number, which refers to the architect/engineer's project identification number.
  7. In the section labeled Re: Contract For, detail the contract or project segment this substitution request pertains to.
  8. Identify the Specification Title, Section, Page, and the exact Article/Paragraph that references the original specified product.
  9. Under the Proposed Substitution area, include the manufacturer’s name, address, phone number, trade name, and model number of the new product.
  10. Specify the Installer’s contact information if different from the manufacturer’s.
  11. Mark the appropriate box to indicate the History of the product (new, 1-4 years old, etc.).
  12. Detail any differences between the proposed substitution and the specified product, attaching point-by-point comparative data if available (mandatory for architect/engineer review).
  13. Explain Reason for not providing specified item, giving clear reasons behind the request for substitution.
  14. If the proposed substitution has been used in similar installations, provide details under Similar Installation, including the project, architect, address, owner, and date installed.
  15. Indicate whether the proposed substitution affects other parts of Work and explain if necessary.
  16. Detail any Savings to Owner for accepting the substitution, including any changes in cost.
  17. State if the proposed substitution changes the Contract Time, specifying any addition or deduction in days.
  18. Check the boxes under Supporting Data Attached to list the types of supporting documents included with the submission, such as drawings, product data, samples, reports, or tests.

After carefully completing the form and ensuring all relevant documents are attached, review it once more for accuracy. The final step is to submit the completed packet to the designated recipient, as stipulated by the project guidelines. Timely and accurate submission of the CSI 13 1A form is critical for the swift processing and approval of proposed substitutions, potentially avoiding delays and additional costs in the project timeline.

Understanding Csi 13 1A

What is the purpose of the CSI 13 1A form?

The CSI 13 1A form is used for requesting a substitution of a product or material after the bidding or negotiating phase of a project. It provides a structured way to submit details about the proposed substitution, including its specifications, the reasons for the substitution, comparative data, and any impact on the project timeline or budget. This form ensures that all parties involved in a project are informed and can make an informed decision regarding the substitution.

Who needs to fill out the CSI 13 1A form?

This form should be filled out by the party proposing the substitution, typically a contractor or a supplier. It's then submitted to the project's architect or engineer (A/E) for review. The form requires detailed information about the proposed product, including its history, the differences from the specified product, and any impact on the project, so the person filling it out needs in-depth knowledge about both the specified and proposed products.

What information is required on the CSI 13 1A form?

Key information required on the form includes the project and request details, description of the specified and proposed substitution products, manufacturer details, a comparison between the proposed and specified products, reasons for not providing the specified item, data on similar installations, potential impacts on other parts of the work, and any cost or time implications. Supporting documents like drawings, product data, and test reports are also required to substantiate the request.

How does the proposed substitution affect the project's timeline and budget?

The form specifically asks whether the proposed substitution will change the contract time or result in cost savings for the owner. This allows the architect/engineer and the project owner to evaluate the impact of the substitution on the project's overall timeline and budget. If the substitution can shorten the project duration or reduce costs without compromising quality, it may be more favorably considered.

What happens after submitting the CSI 13 1A form?

After submission, the form is reviewed by the project's architect or engineer to assess the suitability and impact of the proposed substitution. This review will consider the comparative advantages or disadvantages, potential cost savings, impact on the timeline, and any changes required in other parts of the work. Based on this assessment, the A/E will approve or reject the substitution request. The decision is communicated to the requesting party and, if applicable, adjustments to the project documentation and contracts will be made.

Common mistakes

One common mistake made when filling out the CSI 13.1A form is the incomplete or inaccurate description of the proposed substitution. Individuals often fail to provide a detailed explanation that encapsulates the essence of the substitution they are proposing. This includes neglecting to mention how the proposed item differs from the original specified product. Providing detailed, point-by-point comparative data, as required, is crucial for the assessment. Without this, the proposal lacks the necessary detail for proper evaluation.

Another frequent oversight is the failure to fully address the history of the proposed product. The form explicitly asks for the product's age, ranging from a new product to one that is more than ten years old. Skipping this section or giving vague responses can hinder the understanding of the product's reliability and track record, which are significant factors in evaluating the substitution request.

Many individuals also overlook the requirement to specify if the proposed substitution will affect other parts of the work. This is a critical consideration, as any alteration could have a domino effect on the project. Not disclosing or underestimating the impact of the substitution on other components can result in unanticipated complications, delays, and additional costs.

Not providing a reason for the inability to supply the specified item is another common mistake. This section is vital for understanding the circumstances behind the request, whether they stem from supply chain issues, cost considerations, or other factors. A thorough explanation can significantly influence the decision-making process, offering clarity and justification for the substitution.

Lastly, a significant error is neglecting to report the savings to the owner if the substitution is accepted. This information is not only crucial for the owner's decision-making process but also presents an opportunity to demonstrate the value of the proposed substitution. The omission of potential savings or, conversely, failing to accurately calculate these savings, can detract from the attractiveness of the proposal.

Documents used along the form

The completion of a Substitution Request, specifically the CSI Form 13.1A, marks an important step in managing project materials and services after the bidding or negotiation phase. However, achieving effective documentation and communication throughout a project often requires several other forms and documents. Understanding these additional forms can ensure a smoother process and clearer communication between all parties involved in a project.

  • Change Order Request Form: This document is essential when there are modifications needed in the project's scope, cost, or schedule. It outlines the details of the change, including its impact on the project.
  • Construction Schedule: A detailed plan that outlines the timeline of the project’s phases and milestones. It helps in tracking progress and ensuring that the project remains on track.
  • Material Approval Form: Before specific materials are used in a project, this form ensures that all proposed materials meet the project's specifications and have been approved by the relevant authorities or project leads.
  • Product Warranty Documents: These are vital to guarantee that the materials and products used are covered against defects. They provide details on the terms and coverage of the warranty.
  • Submittal Schedule: It lists all the items that need to be submitted for review, such as plans, specifications, and samples. The schedule helps in ensuring that submissions are made timely and reviewed by the necessary parties.
  • Technical Data Sheets: These sheets contain detailed information about the products and materials proposed for use in the project, including specifications, installation methods, and maintenance requirements.

Together, these documents play a critical role in supplementing the Substitution Request form by providing a comprehensive view of the project's requirements, changes, and progress. They ensure that all parties are informed and agree upon the materials and processes used, reducing the likelihood of delays and misunderstandings. This cohesive approach to documentation not only supports effective communication but also aids in keeping the project within its allocated budget and timeline.

Similar forms

The Change Order Request form is closely related to the Substitution Request (CSI 13 1A form) in its purpose and content. It is used when a contractor or project manager needs to propose adjustments to the original contract terms, typically including changes in the scope of work, materials, or project timelines. Like the Substitution Request, the Change Order Request requires detailed explanations for the proposed changes, including the impact on project cost and schedule. Both documents necessitate approval from relevant parties to ensure that all modifications are clearly documented and agreed upon, maintaining transparency and accountability within the project's framework.

An addendum in the bid documentation phase shares similarities with the CSI 13 1A Substitution Request form by providing modifications or clarifications to the original bid documents. While an addendum is issued during the bidding or negotiating phase to all potential bidders, the Substitution Request is typically submitted by the contractor seeking to replace specified materials or products post-contract award. Both documents serve to ensure that all parties are aware of changes affecting the project scope, specifications, and potentially the contract's terms, thus helping maintain the project's integrity and adherence to its original goals.

The Request for Information (RFI) is another document similar to the Substitution Request form, as it is a formal method of seeking clarification on the project's plans, specifications, or contract documents. However, whereas the RFI primarily aims to resolve uncertainties or gather more information that may impact the project execution, the Substitution Request specifically proposes a change to the previously agreed-upon materials or methods. Despite these differences, both documents are critical for ensuring that any adjustments made do not compromise the project's design integrity, functionality, or contractual obligations.

The Material Approval Request form, akin to the Substitution Request, is a crucial document in construction projects used to obtain approval for materials, products, or equipment not originally specified in the construction documents. It requires the submission of detailed product information, including specifications, manufacturer details, and performance data. Both the Material Approval Request and the Substitution Request aim to ensure that the substituted or newly approved materials meet the project’s requirements, thus maintaining quality and compliance with the project's design and performance standards. Although used at different stages or for slightly different purposes, their roles are fundamental in managing and documenting changes to the project specifications or construction plan.

Dos and Don'ts

When filling out the CSI 13.1A form for a substitution request after the bidding or negotiating phase of a project, certain practices should be followed to ensure that the process is smooth and the application is considered properly. Below are lists of things you should and shouldn't do when completing this form.

Things You Should Do

  1. Provide complete and accurate information for every section, including the project, the substitution request number, and all relevant details about the proposed substitution.
  2. Attach point-by-point comparative data between the proposed substitution and the specified product, as this is required by the architect/engineer (A/E) for a proper evaluation.
  3. Explain the reason for not providing the specified item clearly, including any advantages of the proposed substitution such as cost savings or improvement in quality.
  4. Include supporting data that is relevant to the substitution request, such as drawings, product data, samples, tests, and reports, to back up your claims about the proposed substitution's suitability.

Things You Shouldn't Do

  1. Avoid leaving sections incomplete, as missing information can delay the review process or lead to the outright denial of the substitution request.
  2. Do not guess or provide inaccurate product details; always verify information about the manufacturer, address, phone, trade name, and model number before submitting.
  3. Refrain from omitting the history of the product, including its market presence duration, as this can be crucial in assessing the reliability and performance of the proposed substitution.
  4. Avoid neglecting to mention how the substitution affects other parts of the work or changes contractual time, as these factors can significantly influence the decision to approve or deny the request.

Misconceptions

There are several misconceptions regarding the CSI 13 1A form, which is crucial for those involved in construction projects to understand correctly. Here, we clarify some of the most common misunderstandings.

  • It's only applicable at the start of a project: This form is specifically designed for use after the bidding or negotiating phase, not just at the onset of a project. It is a means to suggest substitutes to initially specified materials or procedures.

  • Any party can submit the form: Generally, the substitution request must be submitted by the contractor or subcontractor involved in the project. It's not a form that just anyone associated with the project can fill out and submit.

  • No reason is needed for a substitution: The form requires a clear explanation for why the specified item is not being provided, including potential savings and impact on the project. A detailed reason is crucial.

  • All products are eligible for substitution: Not all products can be substituted. The proposed substitution must be thoroughly evaluated and approved based on its merits, comparison with the specified product, and its impact on the project.

  • Submitting the form guarantees approval: Submission only initiates the review process; it does not guarantee that the proposed substitution will be approved. The Architect/Engineer (A/E) and project owner's assessment is critical.

  • No documentation is needed with the form: The form requires the attachment of supporting data such as drawings, product data, samples, tests, and reports. This comprehensive information is essential for a thorough evaluation.

  • History of the product is not important: The form asks for the product's history (new, 1-4 years old, 5-10 years old, more than 10 years old) to assess its reliability and suitability for the project. The historical performance of a product is a critical consideration.

  • Proposed substitution doesn’t affect the contract time: Presented substitutions can indeed impact the contract time, either by adding or deducting days. The form specifically asks whether the substitution changes the contract time, highlighting this consideration.

Understanding the correct use and requirements of the CSI 13 1A form helps ensure the smooth progression of construction projects while maintaining quality and efficiency measures.

Key takeaways

Filling out and using the CSI 13 1A form, a crucial tool in the substitution request process after the bidding or negotiating phase of a construction project, requires a detailed understanding and precise approach. Here are key takeaways to ensure its effective utilization:

  • Clearly Identify the Project Details: Start by filling out the basic information about the project, including its name, the substitution request number, and your contact information. This sets a clear context for the substitution request.
  • Specify the Original and Proposed Products: The form demands explicit details about both the originally specified product and the proposed substitution, including manufacturer details, model numbers, and installers. This helps assess compatibility and quality.
  • Attach Comparative Data: Providing point-by-point comparative data between the proposed product and the original specification is mandatory. This comparison should cover aspects like performance, durability, aesthetics, and any other relevant criteria. It's the backbone of the request.
  • Explain the Basis for the Substitution: Disclose the reason why the originally specified item cannot be provided. Reasons can range from availability issues to cost savings. This explanation is essential for the acceptance of your substitution request.
  • Assess Impact on Other Work: Indicate whether the proposed substitution will affect other parts of the work. If yes, a detailed explanation is required. Understanding this impact is critical for project coherence and integrity.
  • Detail Financial Implications: Clearly state any cost savings to the owner if the substitution is accepted. This can significantly influence the decision-making process, especially in projects with tight budgets.
  • Consider Time Adjustments: Indicate whether the substitution will alter the contract time. Both additions and deductions in days must be specified, as time is a crucial factor in project planning and execution.
  • Attach Supporting Documentation: Attach all necessary supporting data such as drawings, product data, samples, tests, and reports. These documents provide the evidence needed to validate the substitution request and ensure that the proposed product meets or exceeds the performance of the original specification.

By meticulously adhering to these guidelines when filling out the CSI 13 1A form, participants can streamline the substitution request process, fostering a smoother progression of construction projects. This not only aids in maintaining adherence to project timelines and budgets but also ensures that the quality and integrity of the work are upheld.