The Peco Service And Meter Application form is a critical document for individuals or businesses looking to establish or modify electric service and meter arrangements with PECO, a major utility provider. It guides applicants through the process, requesting detailed information to ensure compliance with PECO's requirements and facilitate the provision of electric service tailored to the applicant's needs. Knowing how to accurately complete this form can streamline the application process, avoiding delays and ensuring that electric service meets the specific demands of the location. For a smooth application process, consider filling out the form by clicking the button below.
Applying for electric service and meter installation is a significant step in ensuring the functionality and safety of any residential or commercial property. The PECO Service and Meter Application form, M-24175, revised as of May 2018, serves as a comprehensive guide for applicants to request new services, modifications, or reinstatements of electrical supply. This document outlines the step-by-step process for submitting an application, starting with identifying the appropriate PECO regional office for the service location and detailing the requirements for customer information, including name, address, and identification numbers. It also specifies the necessity for electricians or contractors to provide their details and the demand for tax identification numbers. The form further delves into the technical aspects of the service required, such as the type of request, service characteristics, meter information, and details about the load characteristics and motor information if applicable. Additional sections request information on current construction status, expected service commencement dates, and whether specialized metering will be used. It emphasizes the importance of compliance with PECO Electric Service Requirements, the potential need for a credit application for new customers, and the protocol for demolition requests. This detailed application process ensures that all necessary information is collected to facilitate a smooth and efficient service setup, catering to both the immediate needs and future demands of the applicant’s electrical service.
INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER
Please refer to the sample application while reviewing the following notes. The letters below correspond with those on the sample. NOTE: THE "BLANK" FORM IS BELOW THE "SAMPLE" FORM
A.After reading the instructions at the top of the application, locate the PECO regional office in which the service is requested. Check the appropriate box and mail or fax the completed application to the appropriate regional office.
B.Complete the fields for customer's name and service location. Customer's Driver's License Number or Social Security Number is now required.
Note: (*) Include PECO Energy pole # and/or Lot # only if applicable.
(**) Use the address of the service when applying for underwriter's inspection.
C.Complete the fields for customer's PECO billing address or account number (within last 60 days).
D.Complete fields regarding you as the electrician or contractor, and indicate where you would like the reply sent. The Electrician/Builder Tax Identification number is now required. Also, please include the date you would like the reply returned to you.
E.Indicate your current construction status, and include the date PECO service is requested. Please avoid using "as soon as possible".
F. thru J. Indicate the following:
•Type of Request
•Type of Service (include number of units and area per unit)
•Service Characteristics
•Meter Information
•Heating/Air Conditioning
K.Complete the table concerning the load characteristics of the service. For each applicable type of load, provide: 1) Connected KW, 2) Maximum Summer KW Demand, and 3) Maximum Winter KW Demand.
L.Complete the table concerning motor information.
M.If compensated metering will be used, indicate totalizer and general load (KW).
N.Include any additional comments.
O.
Application MUST be signed and dated.
Forms Rev. 5/18
PECO
Application for Electric Service & Meter
M-24175 (front) Rev. 5/18
INSTRUCTIONS:
Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.
All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.
A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.
NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR DEMOLITION REQUEST
NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com
PHILADELPHIA
DELAWARE & CHESTER COUNTIES
BUCKS & MONTGOMERY
NEW RESIDENTIAL
COUNTY
1050 W. Swedesford Rd.
COUNTIES
CONSTRUCTION
A
830 S. Schuylkill Ave.
Berwyn, PA 19312
400 Park Ave.
(All Counties)
Philadelphia, PA 19146
Email:DelChesterServiceApplications@ex
Warminster, PA 18974
Email:PhilaNewBusiness@e
eloncorp.com
Email:Bucksmontserviceapplications@e
Warminster, PA
18974
xeloncorp.com
Fax # (610) 725-1416
Email:NRCGMETERORDERS@P
Fax # (215) 731-2327
Fax # (215) 956-3240
eco-Energy.com
Fax # (215) 956-3380
CUSTOMER NAME
Tax ID # or SSN
TYPE OF REQUEST
New Service
Load Increase/Decrease
Reintroduction of Service
Temporary Service
Upgrade/Changes
Demolition (Remove
Separation of Wiring
Service Relocation
Service)
** ADDRESS TO BE SERVED
B
APARTMENT/LOT #
F
Make-Safe (De-
energize/Cover)
CITY, STATE
ZIP CODE
TYPE OF SERVICE: Please include site plan.
RESIDENTIAL
COMMERICAL
Single House
Mobile Home
Store
Office
G
Apartment
Modular Home
Industrial
Warehouse
UTILITY POLE#
SUBDIVISION/DEVELOPMENT
TOWNSHIP/MUNICIPALITY/WARD#
Duplex
Town House
Restaurant
Other _____________________________
Area of Building _______________________ Sq. Ft.
* If Applicable
SERVICE CHARACTERISTICS:
** Please use this address when applying for underwriter’s inspection
PHASE
VOLTS
WIRES
Underground
Aerial
CUSTOMERS BILLING ADDRESS
C
-OR-
PECO ENERGY ACCOUNT#
3
240
AMPS _________
120/240
4
120/208
TELE. #
1
120
2
277/480
13200
3 or 4
SEND REPLY TO:
5
33000
ELECTRICIAN’S OR BUILDER’S NAME
METER INFO:
Two Meters, Commercial (General/Totalizer)
I
Single Meter Required
Multiple Meter Total No. _____________
ADDRESS
Reply Requested by:
HEATING/AIR CONDITIONING:
D
/
Central Air _____ Tons
Resistance
J
Heat Pump _____ Tons
Natural Gas
Propane
Type Back-Up _________
Other ________________
City, State
CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:
CONNECTED
PECO ENERGY USE ONLY (DEMAND)
TYPE
LOAD (kW)
E-MAIL ADDRESS
SUMMER (kW)
Winter (kW)
LIGHTING
K
CURRENT CONSUTRCTION STATUS:
HEATING
Not Started – Date Customer Will Start Work: _____/_____/_____
In Progress Completed
AIR/COND.
Approximate Date Service Requested: _____/_____/_____
E
TANKLESS WATER HTR
MISC
CUSTOMER COMMENTS/ DESCRIPTIN OF WORK
N
TOTAL
Include single line diagram and substation arrangement if appropriate.
LARGEST MOTOR SPECIFICATIONS
O
QUANTITY
TOTALIZER LOAD
SIZE (HP)
L
M
LOCKED ROTOR CURRENT
KW
MOTOR CODE LETTER
SUBMITTED BY: _________________________________ DATE: ______________________
GENERAL LOAD
VOLTAGE
Enclosures: Site Plans Single Line Diagram Substation Arrangement
FREQ. OF STARTING (PER HR.)
PURPOSE
INFORMATION BELOW WILL BE FILLED IN BY PECO:
Service Request No.
BUS/MAJ ACCT REP
TELEPHONE
DATA RECEIVED
DESIGNER
POL SUB
RATE
RIDER
CONTRACT LIMITS
SIC NUMBER
T
DATE REPLY
NUMBER
COMPLETED
AMPS
CIRCUIT
C-QUAD
T-QUAD
LOAD (KVA)
SUMMER_____WINTER ____
SERVICE CHARACTERISITICS – Select One from Each
POLE # / MH # LOCATION
CUT THROUGH DATE
SERVICE TYPE
URD
RATE:
Residential
Comm (Non-
Comm (Demand)
HT/PD
Demand)
GENERATION PROCUREMENT CLASS:
Class 1 (Residential)
Class 2 (Commercial, less than 100kW)
Class 3 (Commercial, 100kW to 500kW)
Class 4 (Commercial, greater than 500kW)
NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load
estimates for the first year of service. The customer’s Procurement Class will be adjusted each year,
based on actual usage.
METER TYPE:
KWH
IND. DEMAND
RECORDER
TOU
SERVICE PHASING:
SINGLE PHASE
TWO PHASE
THREE PHASE
SERVICE REQUIREMENTS:
METERING LOCATION AND REQUIREMENTS:
Present Location:
Meter # _______________
CTs-
PTs-________
Present Service OK
Loop Only
________
Taps Only
See Job # ________________________________
Indoo
Outdoor
On ________ Wall, ________ Ft. From ________ Wall, ________ ft. Above
r
Ground
ADVANCE NOTIFICATIONS:
CUSTOMER BILLING:
Underwriter’s Cert.
Yes
No
Advance Billing
$_______________
Required
__
Customer to Trench
No Customer
Permit Required
State
Other
Charges:
_______________________
Cust. #
Date
ACT 222 Cert. Required
Yes #
N/A
_________________________
___________________________
_____________
BTCO #
PA One Call #
________________________
__________________________
CATV #
Gas
BTCO
CATV
___________________
Other
SKETCH / INSTRUCTIONS
PHILADELPHIA COUNTY
Email:PhilaNewBusiness@ex
Email:DelChesterServiceApplications@exe
loncorp.com
*
If Applicable
**
Please use this address when applying for underwriter’s inspection
E-MAIL ADDRESS #
Not Started – Date Customer Will Start Work: _____/_____/_____ In Progress Completed
CUSTOMER COMMENTS/ DESCIPTION OF WORK:
T NUMBER
SUMMER_____WINTER
____
Comm (Non-Demand)
NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load estimates for
the first year of service. The customer’s Procurement Class will be adjusted each year, based on actual usage.
CTs- ________
Indoor Outdoor
On ________
Wall, ________ Ft. From ________ Wall, ________ ft. Above Ground
See Job # _________________________________
Underwriter’s Cert. Required
Advance Billing Required Yes
$_________________
No Customer Charges: $_________________
Other _______________________
Cust. # _________________________
Date ___________________________
Yes # _____________
BTCO # ________________________
PA One Call # ___________________________
Date __________________________
CATV # ________________________
Other ___________________
Other __________________________
Filling out the Peco Service And Meter Application form is a critical step to obtain electric service for your new or existing property. Whether you're looking to set up a new service, change or upgrade your current one, the key lies in submitting a filled application to Peco. Understanding and completing the application accurately ensures a smoother process. Here are the steps you need to follow:
After completing these steps, mail or fax the application to the address for the regional office you identified in step 2. By following these thorough but straightforward steps, you’re well on your way to establishing electric service with PECO, tailored to your specific needs. Remember, accurate and complete information facilitates a quicker and smoother approval process.
What is the purpose of the PECO Service And Meter Application Form?
The PECO Service and Meter Application form is designed for customers seeking to establish or alter electric service and meter setups. This includes new connections, service upgrades, load increases or decreases, temporary services, and demolitions among other requests. The form gathers necessary details to process these requests effectively, ensuring compliance with PECO's Electric Service Requirements and facilitating proper coordination for installation or changes.
How can I submit the PECO Service And Meter Application Form?
The completed form can be submitted to the PECO regional office corresponding to the location where the service is required. Each region has its specific contact information, including mailing and fax details. It's essential to fill out the form with accurate and complete information to avoid processing delays.
What information is required when filling out the form?
Applicants must provide a comprehensive range of information, including the customer's name, service and billing addresses, Tax Identification or Social Security Number, the type of service requested, details about service characteristics (such as phase, volts, and wires), and specific information regarding the new or additional load. The application also requires details about the construction status, heating/air conditioning specifications, motor information, and any comments or diagrams that might support the request.
Is a customer’s Social Security Number or Driver’s License Number mandatory for the application?
Yes, either the customer's Social Security Number or Driver's License Number is required when completing the application. This information helps in verifying the identity of the customer and assists in the processing of the application.
Can I specify a desired date for service installation?
While the form allows you to indicate a preferred date for service initiation, it encourages avoiding the term "as soon as possible." Providing a specific desired date assists PECO in scheduling the work accordingly, though actual installation dates will depend on PECO’s assessment and workload.
What should I do if I need to request the removal of electric or gas facilities due to demolition?
If demolition of a building is planned and requires PECO to remove electric or gas facilities, it's crucial to call 8-1-1 for a PA ONE CALL demolition request. This ensures that all necessary precautions and arrangements are made safely and in compliance with legal and utility regulations.
What happens if the form is incomplete?
Incomplete forms may result in delays in processing your request. To ensure smooth and efficient handling, double-check that all required fields are filled out and that any necessary supplemental information, such as site plans or diagrams, is provided.
What if I have never had PECO service or it's been more than 60 days?
Customers who have not had PECO service within the last 60 days must complete a credit application and agreement. This step is necessary to establish your account and determine the terms of service before processing any requests for connection or changes.
How long does PECO take to respond to a service and meter application?
The response time for a service and meter application can vary depending on the complexity of the request, the completeness of the application, and PECO's current workload. The company endeavors to process requests promptly, but it reserves the right to cancel a request if no further communication is received from the customer within 90 days of PECO's response date.
Filling out the PECO Service and Meter Application form requires attention to detail to ensure accuracy and avoid delays in processing. However, some common mistakes often occur during this process. One frequent error is not selecting the correct regional office where the service is requested, as specified in section A. This simple step is crucial for ensuring the application reaches the right destination for processing.
Another common issue is incomplete or incorrect information in sections B and C, where applicants must provide their name, service location, and customer billing address or account number. Failing to include a driver's license number or social security number, as now required, can also lead to delays. It’s important to double-check these fields for accuracy and completeness.
Section D, which requires details about the electrician or contractor, including the Tax Identification number, is another area where mistakes are made. Applicants sometimes forget to indicate where the reply should be sent or neglect to include the desired date for the reply, missing crucial communication from PECO.
In section E, specifying the current construction status and the requested date for PECO service to begin is often overlooked. Using vague terms like "as soon as possible" instead of providing a specific date can complicate scheduling and planning.
From sections F through J, applicants must detail the type of request, service, service characteristics, meter information, and heating/air conditioning specifications. Errors or omissions in these sections can lead to improper service setup. Additionally, failing to complete the table concerning load characteristics (section K) and motor information (section L) with accurate data can result in incorrect service provision that doesn’t meet the customer’s actual needs.
When compensated metering is applicable, as mentioned in section M, not indicating the totalizer and general load (KW) can lead to billing and service discrepancies. Similarly, leaving additional comments (section N) or the largest motor specifications (section L) blank when there are pertinent details to share can hinder PECO’s ability to provide the most appropriate service.
Last but certainly not least, one of the most critical mistakes is not signing and dating the application (section O). Without a signature, the application is considered incomplete and cannot be processed. Ensuring that all sections of the form are carefully reviewed and accurately filled out is essential for a smooth submission process.
When submitting the PECO Service And Meter Application form, several other documents and forms are commonly required to ensure a comprehensive and compliant application process. These additional documents help in understanding the specifics of the electrical service required and in verifying the applicant's details. Below is a list and brief description of these commonly used forms and documents:
Together with the PECO Service And Meter Application, these documents form a complete application package, ensuring that the electric service setup process proceeds smoothly and efficiently. It’s important for applicants to provide accurate and detailed information to avoid delays in the process.
Similar to the PECO Service And Meter Application form, a Utility Connection Request form is used when a customer seeks to establish a new utility connection or make changes to an existing one. This document typically requires the customer's personal information, the service address, and specifics about the type of service needed, such as water, gas, or electricity. Just like in the PECO form, applicants might need to specify the desired date for service initiation, detail the technical requirements of their installation, and possibly submit site plans or schematics for review. Both forms facilitate the logistical and technical arrangements necessary to ensure that utility services are appropriately connected and configured according to the customer's needs and site specifications.
A Building Permit Application shares similarities with the PECO Service And Meter Application form in that both are integral to the process of starting new construction or renovation projects. Building permits are required to ensure that all constructions comply with local zoning laws, building codes, and safety standards. Applicants must provide detailed information about the project, including location, owner details, contractor information, and the scope of work. Like the PECO application, this process is crucial for coordinating with local utilities and regulatory bodies to secure necessary approvals and inspections before commencing work, albeit addressing a broader range of construction activities.
An Electrical Service Upgrade Request form is another document closely aligned with the PECO application. This form is specifically used when a property owner or developer needs to increase the electrical capacity of a building to accommodate additional load requirements. The document requires detailed information about the existing service, the requested service capacity, and the purpose of the upgrade, mirroring sections of the PECO form dedicated to service characteristics and load details. Submission of this request initiates a review process by the utility provider to assess the feasibility and determine the modifications needed to deliver the requested service upgrade.
The Contractor's Request for Utility Location form is used by contractors before starting any construction or excavation work to ensure that no utility lines are damaged in the process. While it focuses on identifying and marking existing utility lines rather than establishing new service, it shares with the PECO form the necessity for detailed site information, project descriptions, and communication between contractors and utility providers. Accurate completion of this form helps prevent service disruptions and ensures safety by avoiding accidental damage to underground utilities, highlighting the interplay between construction activities and utility service management.
Finally, a Temporary Construction Service Request form is akin to the PECO application, specifically in scenarios where temporary electrical service is needed on a construction site before the permanent service is established. This document requires information similar to what is found in the PECO form, including details about the project location, the expected duration of the need for temporary service, and the specifics of the required electrical setup. Both forms facilitate the provision of electrical services tailored to the developmental stage of a project, ensuring contractors have the power needed to complete construction activities efficiently.
When it comes to filling out the PECO Service and Meter Application form, paying attention to detail is crucial for a smooth process. Here are some important dos and don’ts that can help guide you through the application without any hitches.
By following these guidelines, you’ll ensure your PECO Service and Meter Application is properly filled out and submitted, paving the way for a smoother process and quicker approval.
When completing the PECO Service and Meter Application form, applicants often navigate through misconceptions that can lead to confusion and delays in processing. Understanding these misunderstandings is crucial for accurately completing the form and ensuring a smooth application process.
Correcting these misconceptions helps applicants in preparing their application more accurately, leading to a smoother process in obtaining electric service. It emphasizes the importance of carefully reviewing and complying with the instructions provided by PECO to avoid unnecessary delays or complications.
When managing the Peco Service And Meter Application process, understanding and accurately completing the form is crucial for a prompt and smooth service setup. Here are four key takeaways to guide you through the process:
These steps not only streamline the application process but also ensure that the electrical service meets the specific requirements of the area and complies with all necessary regulations and standards.
Nycers F501 - Nominate a guardian for minor beneficiaries directly on the F501 form for post-retirement benefits.
What Is 1120s - A document that bridges the gap between corporate revenue reporting and individual tax obligations for S corporation shareholders.
Notice of Inconsistent Treatment - The sequence number 84 designates Form 8082's place within the IRS form catalog, ensuring proper organization and processing.