The Schedule of Values (SOV) form is a detailed list used in the construction industry that outlines each component of the work to be completed, along with its corresponding value and progress status. It serves as a vital financial tool for managing project payments and tracking the completion status against the budget. To ensure your project stays on track and within budget, accurately filling out the Schedule of Values form is paramount. Click the button below to start filling out your form correctly.

Get Form

In the realm of construction management, the Schedule of Values (SOV) serves as a foundational document, detailing the planned progress and financial aspects of a construction project. By breaking down the project into individual components, this form enables both contractors and project owners to track work progress, materials used, and the financial health of the project. Components of the SOV include the project and application name, item numbers, descriptions of work, scheduled values, work completed to date, and materials present, among others. This organized system not only facilitates smooth communication between all parties involved but also ensures a transparent and efficient billing and payment process. Furthermore, it plays a crucial role in managing retainage and identifying any balance to finish, thereby promoting accountability and minimizing disputes. Amidst its significance, it's essential to acknowledge the disclaimer that reminds users about the limitation of any information provided, emphasizing that details offered in templates like the SOV should be tailored to fit the specific requirements of each construction project.

Preview - Schedule Values Form

SCHEDULE OF VALUES CONSTRUCTION TEMPLATE

PROJECT

 

 

 

APPLICATION

 

APPLICATION

 

 

NAME

 

 

 

NO.

 

DATE

 

 

PROJECT

 

PROJECT NO.

 

% COMPLETE

 

PERIOD TO

 

 

MANAGER

 

 

TO DATE

 

 

 

 

 

 

 

 

 

 

 

 

C

D

E

F

G

H

I

ITEM NO.

DESCRIPTION OF WORK

SCHEDULED

WORK

WORK

MATERIALS

TOTAL

BALANCE TO

RETAINAGE

 

 

VALUE

COMPLETED

COMPLETED

PRESENT

MATERIALS

FINISH

 

 

 

 

from this

from previous

 

 

 

 

 

 

 

period

periods

 

 

 

 

 

 

 

 

prev app D + E

not in D or E

D + E + F

C -- G

if variable rate

TOTALS

 

CONTRACT MANAGER – Minimum performance

DATE:

requirements successfully completed and approved by:

 

DISCLAIMER

Any articles, templates, or information provided by Smartsheet on the website are for reference only. While we strive to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability, or availability with respect to the website or the information, articles, templates, or related graphics contained on the website. Any reliance you place on such information is therefore strictly at your own risk.

Document Specs

Fact Name Detail
Purpose The Schedule of Values (SOV) is a detailed form used in the construction industry to outline the cost of each component of a project, allowing for effective project financial management and progress tracking.
Components It includes information such as Item number, Description of Work, Scheduled Value, Work Completed, Materials Present, and Total Balance to Finish, among others.
Progress Payment Calculation SOV helps in calculating the amount due for payment at different stages by comparing work scheduled to work actually completed and materials present.
Retainage The form accounts for retainage, a portion of the contractor's earned revenue held back until project completion to ensure all obligations are met.
Modification and Updates Throughout the project, SOV can be updated to reflect changes in the project scope, ensuring all parties have an accurate financial record.
Use in Project Management Project managers and contract managers utilize the SOV for tracking project progress against the planned schedule and budget.
State Specific Forms Some states may have specific forms and requirements governing the use of the Schedule of Values, mandating compliance with local construction laws.
Legal Disclaimer Information provided on the SOV, according to Smartsheet, is for reference only, without warranties regarding its completeness, accuracy, or reliability.

Instructions on Writing Schedule Values

Filling out a Schedule of Values form can seem like a daunting task at first glance. Primarily used in the construction industry, this document serves as a comprehensive list detailing each component of work, along with its corresponding value in the overall project. This form plays a crucial role in managing payments and tracking the project’s financial progress. The idea is to break down the work into manageable sections, making it easier to assess work completion and material usage at any given point. Understanding how to fill this out correctly ensures accurate financial oversight and smooth operation throughout the project lifecycle. Here's a step-by-step guide to help you navigate the process.

  1. Start with the Project Application section at the top of the form. Here, you’ll enter the Application Name, Application No., and Date. These details identify the particular application this schedule is for, ensuring it's tracked properly throughout the project's duration.
  2. Under Project, fill in the Project No. This is typically provided by the project manager or found in project documentation. It is essential for linking the schedule of values to the correct construction project.
  3. Next, input the % Complete to indicate the overall progress made on the project to date. This percentage helps stakeholders understand how much of the work has been accomplished.
  4. In the Period To field, specify the reporting period this application covers. This is crucial for tracking progress and financial expenditure over specific time frames.
  5. Moving on to the main table, begin with Item No. Each line of work or material type specified in the contract should have a unique item number for easy reference.
  6. For each item listed, describe the work or materials in the Description of Work field. Be as detailed as necessary to ensure clear understanding and accurate assessments of work or materials involved.
  7. In the Scheduled Value column, state the total value assigned to each item per the contract. This is the agreed upon price for the described work or materials, contributing to the total project cost.
  8. Fill in the columns for Work Completed and Materials Present to report the value of work done and materials delivered to site during this period. These figures are essential for calculating payments and tracking project expenditure.
  9. Next, under Total Completed and Stored to Date, add the total value of work done and materials stored up to this period. This includes work and materials from the current and previous reporting periods.
  10. In the Balance to Finish column, calculate the remaining work value by subtracting the Total Completed and Stored to Date from the Scheduled Value. This helps in determining what is left to be done and the funds required to complete it.
  11. If applicable, enter the Retainage rate or amount. This represents the portion of payment withheld until the completion of the project, serving as financial protection for the project owner.
  12. Finally, at the bottom of the form, ensure that the Totals for each column are correctly calculated. These figures give an overall view of the project’s financial status and work progress.
  13. Sign and date the form under Contract Manager to certify that the minimum performance requirements have been successfully completed and approved.

Once you've accurately filled out the Schedule of Values form, it becomes an essential tool for managing project finances, tracking progress, and facilitating communications between contractors and project owners. It's a dynamic document, regularly updated throughout the project’s lifecycle, reflecting the ongoing financial and work status. Properly maintaining this schedule ensures transparency and helps prevent disputes over payments, contributing to a smoother and more efficient project completion. Remember to always double-check your entries for accuracy and consult with project management or financial professionals if you encounter difficulties.

Understanding Schedule Values

What is a Schedule of Values in construction projects?

A Schedule of Values (SOV) is a detailed statement furnished by the contractor, listing the portions of work and their corresponding value included in a construction project. This document is used to monitor the progress of the project, manage payment processes, and keep track of the financial status. It typically includes item numbers, descriptions of work, scheduled value, work completed to date, materials stored, and the total costs, alongside retainage and the balance to finish.

How is the Schedule of Values form used during a project?

The Schedule of Values form serves several crucial roles in construction management. Primarily, it functions as a financial tool for allocating the total contract sum into specific portions of work. This breakdown helps both the contractor and project owner monitor the progress of work against the planned budget. It also facilitates the periodic payment process, where payments are made based on the percentage of work completed as listed on the form. Additionally, the SOV aids in managing material procurement and storage costs, ensuring that payments for materials stored but not yet installed are accounted for.

What does the 'percent complete' column represent?

In the SOV, the 'percent complete' column indicates the proportion of work that has been finished for each line item relative to the total work required for that item. This percentage helps both the contractor and the project owner to visually and financially assess the progress of each specific task throughout the construction process. It is a critical metric for calculating the current payment due, as it reflects the actual work done and materials supplied up to the date of the application.

Can the Schedule of Values be amended?

Yes, the Schedule of Values can be amended or adjusted during the project. Amendments may be necessary due to changes in the scope of the project, unforeseen conditions, or additional work not originally accounted for. Any changes to the SOV must be mutually agreed upon by the contractor and the project owner or manager, ensuring that the document accurately reflects the current status and scope of the project. These amendments are crucial for maintaining transparency and ensuring that the payment requests match the actual work completed.

How are materials stored on site reflected in the SOV?

Materials stored on site are represented in the SOV under a specific column dedicated to noting the cost of present materials that have not yet been installed. This allows for the contractor to request payment for these materials as part of the work progress, acknowledging that investment has been made towards the completion of the project, even though these materials have not been incorporated into the work yet. This inclusion ensures accurate accounting of project costs and supports cash flow to the contractor for materials procurement.

What happens if there is a discrepancy in the Schedule of Values?

If discrepancies arise in the Schedule of Values, such as errors in the listed values, percentages completed, or misallocation of costs, it is imperative to address these issues promptly. The contractor and the project owner or manager should review the document together, identify any inaccuracies, and make the necessary amendments. Swift resolution of discrepancies is crucial to prevent delays in payments, maintain trust between parties, and ensure the smooth progression of the construction project.

Common mistakes

One common mistake people make when filling out the Schedule of Values form is failing to accurately describe the work. This section, crucial for clarity and accountability, should concisely represent each task's scope. A vague or inaccurate description can lead to misunderstandings about project scope and deliverables, potentially causing disputes between contractors and project managers. Detailed, clear descriptions ensure all parties have a unified understanding of the project components.

Another frequent error is the incorrect calculation of the scheduled value. The scheduled value, representing the total negotiated cost for each component of the work, serves as the basis for the entire payment structure. When these figures are inaccurately reported, it can disrupt the entire financial management of the project, leading to budget overruns or shortfalls. It’s essential to double-check these calculations to maintain fiscal responsibility throughout the project lifecycle.

Incorrect reporting of the work completed to date is also a common pitfall. This figure should reflect the actual progress made on the project during the reporting period. Overestimating work completed can lead to premature payments, while underestimating can strain cash flow and hamper project momentum. Accuracy in this area is vital for maintaining the trust between contractors and project managers and for ensuring that payment schedules accurately reflect work progress.

Many also struggle with accurately reporting materials present on site. This column in the Schedule of Values form should include the cost of materials currently stored at the project site but not yet installed. Misreporting this figure can lead to inaccuracies in the total project value and affect the project’s financial health, especially if materials are lost, damaged, or not used.

One overlooked aspect is the maintenance of the balance to finish column. This column indicates the remaining value of work to be completed and is crucial for budget tracking and project forecasting. Neglecting to update this column can give a misleading picture of project health and progress, potentially leading to misallocation of resources or inadequate scheduling.

Failing to account for retainage correctly is another major error. Retainage, a portion of the contractor’s earned revenue held back until project completion to ensure quality and completion, varies by contract. Incorrectly calculating or applying retainage can impact a contractor's cash flow significantly and lead to disputes. It is paramount to understand the specific retainage terms outlined in the project contract and apply them accurately.

Errors in totaling the columns can stem from simple mathematical mistakes but have complex repercussions. These totals are essential for measuring project progress and financial status. Any error, no matter how small, can lead to significant discrepancies over time, affecting the entire project's financial planning and tracking.

Lastly, a common mistake is not regularly updating the Schedule of Values to reflect changes in the project. Projects evolve, and the Schedule of Values should be a living document, adjusting to reflect additional work, change orders, or shifts in project scope or costs. Failing to update this document can lead to outdated financial tracking, impacting decision-making and project success.

Documents used along the form

When embarking on a construction project, the Schedule of Values (SOV) form serves as a cornerstone, delineating the project's financial and work progress. Yet, this vital tool doesn't operate in isolation; it harmonizes with other key documents to ensure comprehensive oversight and management of the project. These documents, ranging from the application for payment to change order forms, each play a specialized role in the construction management ecosystem.

  • Application for Payment: This document complements the Schedule of Values by providing a detailed request for payment based on the work completed and materials procured as outlined in the SOV. It's a formal declaration of the amount the contractor believes is due, reflecting percentages of completion and aligning with the values scheduled.
  • Change Order Form: Construction projects often evolve, necessitating adjustments to the original contract. The Change Order Form documents these variations, specifying changes in scope, materials, costs, and any impact on the schedule. When amendments affect the SOV, this form ensures alignment between the scheduled values and the project's current direction.
  • Performance Bond: This security measure provides financial protection to the project owner in case the contractor fails to fulfill their obligations as outlined in the contract and the SOV. It assures that the project can be completed according to the initially agreed terms, safeguarding the investment tied to the scheduled values.
  • Work Breakdown Structure (WBS): Although not a form per se, this project management tool is crucial for defining and organizing the project's scope into manageable sections. The WBS helps correlate the detailed work packages and tasks with their corresponding values in the SOV, facilitating effective tracking and reporting of progress and costs.

Together, these documents weave a comprehensive fabric of accountability and structure around a construction project. They ensure that all aspects of the project, from financial transactions to scope changes, are meticulously documented and aligned with the project's goals as portrayed in the Schedule of Values. This synergy not only promotes transparency and efficiency but also builds a strong foundation for successful project completion, making the intricate process of construction management smoother and more predictable.

Similar forms

The Change Order Form bears a resemblance to the Schedule of Values form, primarily in managing alterations in a construction project. Both documents provide structured means to document adjustments - the Change Order Form explicitly for variations in scope, cost, or time, while the Schedule of Values outlines the financial status of individual components of the work, accommodating updates as the project evolves. Each serves a critical role in keeping project financials transparent and up-to-date, facilitating smooth communication between all stakeholders.

A Payment Application form is akin to the Schedule of Values form, as both are pivotal in the construction payment process. The Payment Application form is typically used to request payment for work completed during a specific period, detailing the value of labor and materials. It closely interacts with the Schedule of Values, which breaks down the entire project into manageable sections for financial tracking. This synergy ensures that payments are accurate and reflect the actual work done, preventing disputes and ensuring contractors are paid timely and fairly.

The Construction Contract closely aligns with the fundamentals of the Schedule of Values form. The contract outlines the agreement between parties regarding the scope, timeline, and cost of a project, setting the stage for detailed tracking in the Schedule of Values. This document translates the contract's broad financial agreements into itemized, manageable parts, serving as a reference for progress and payments. Ensuring consistency between these documents is crucial for maintaining contractual integrity throughout the project lifecycle.

The Work Breakdown Structure (WBS) shares similarities with the Schedule of Values, as both dissect the project into smaller, detailed elements. While the WBS focuses more on the division of project tasks and deliverables for management and planning purposes, the Schedule of Values translates these elements into financial terms. This financial breakdown is essential for budget tracking, payment scheduling, and overall financial management of the project, illustrating the financial implications of the project's structure and progress.

The Progress Report in construction projects parallels the Schedule of Values in terms of monitoring and communicating the project's advancements. The Progress Report offers a narrative or graphical representation of the overall project status, including completed and pending tasks. The Schedule of Values complements this by providing a financial perspective on the progress, highlighting the cost associated with completed works. Together, they provide a comprehensive view of both physical and financial progress.

Budget Forecasting documents, much like the Schedule of Values, are integral for the financial planning and monitoring of a project. These forecasts enable stakeholders to predict future costs and revenues, making adjustments as needed for financial health. The Schedule of Values brings specificity to this process, detailing the cost allocation for each work component, which aids in creating more accurate and reliable financial forecasts throughout the project's duration.

The Project Plan, while broader in scope, intertwines with the Schedule of Values form through its detailed outline of project objectives, milestones, and deliverables. The financial implications and tracking of these elements are catered to by the Schedule of Values, making it a monetary reflection of the project plan. This financial delineation is crucial for aligning project execution with budgetary constraints and goals, ensuring the project remains on track both in scope and cost.

Quality Control Checklists interface with the Schedule of Values form by ensuring that work meets or exceeds the project's quality standards before payments are made. These checklists provide a step-by-step verification of work quality, paralleling the financial checkpoints in the Schedule of Values that link payment to satisfactory completion of work. This relationship ensures that financial disbursements are aligned with quality achievements, reinforcing the value of work done against the projected budget.

The Project Timeline, which outlines the schedule for project tasks and milestones, correlates with the Schedule of Values through the synchronization of work completion and financial tracking. As the project advances according to the timeline, the Schedule of Values is updated to reflect the financial status of these tasks, ensuring that payments correspond with the project's temporal progress. This alignment is crucial for maintaining a balanced cash flow and meeting project deadlines efficiently.

Risk Management Plans share a strategic connection with the Schedule of Values form, focusing on identifying, analyzing, and mitigating risks that could impact the project financially and operationally. The Schedule of Values contributes to this process by highlighting financial commitments and exposures at each stage, aiding in the allocation of resources to mitigate risks effectively. This proactive approach ensures that the project remains financially viable while safeguarding against potential setbacks.

Dos and Don'ts

When filling out a Schedule of Values form, it’s crucial to approach the task with precision and mindfulness. This document outlines the financial aspects of a construction project, establishing a baseline for work progress and financial management. Below are key do's and don'ts to help guide you through this process effectively.

Do:

  • Review the contract thoroughly. Before filling out the form, it’s important to understand the project’s scope and the specific requirements outlined in the contract. This ensures that the values listed match the contractual obligations.
  • Be detailed in your descriptions. When listing work items, provide clear and precise descriptions. This clarity helps avoid confusion and ensures that both the project team and the manager have the same understanding of each item's scope.
  • Include accurate percentages for work completed. To accurately reflect the project's financial status, assess the percentage of work completed with care. Overestimation or underestimation can lead to budgeting issues and mistrust.
  • Regularly update the form. As the project progresses, the Schedule of Values form should be updated to reflect current work completion and material costs. This keeps the financial tracking of the project up to date.

Don't:

  • Guess on costs. Each item listed should have an assigned value based on accurate estimates or actual costs. Guesswork can lead to financial discrepancies affecting the entire project.
  • Ignore retainage values. Retainage is a key financial mechanism in construction contracts. Not correctly applying or calculating retainage can affect cash flow and the overall financial management of the project.
  • Forget to list all materials. Even if materials are not yet incorporated into the project, their costs should be accounted for in the Schedule of Values if they've been purchased. Overlooking materials can misrepresent the project's financial status.
  • Submit without reviewing. Always review the completed form for accuracy and completeness before submission. Errors or omissions can cause payment delays and affect project timelines.

Misconceptions

Understanding the Schedule of Values (SOV) form in construction project management is essential for a clear financial breakdown of the work to be completed. However, there are several misconceptions about the SOV that can lead to confusion or misuse. The following are five common misconceptions about the Schedule of Values form and clarifications to help rectify these misunderstandings.

  • Misconception 1: The Schedule of Values is just a billing tool.

    While the SOV is indeed used to request payments, its utility extends beyond mere invoicing. It serves as a crucial document for tracking the project's financial progress, aligning the budget with actual expenses, and providing a basis for performance measurement against the work schedule. Therefore, it is a comprehensive financial management tool, not just a billing aid.

  • Misconception 2: Any changes in the project do not need to be reflected in the SOV.

    This is incorrect. The SOV should be updated to reflect all changes in the project, including additions, deletions, or modifications to the scope of work. These updates ensure that the SOV accurately represents the current state of the project, allowing for proper management and billing of the work.

  • Misconception 3: The SOV includes detailed information about labor costs.

    Although the SOV breaks down the project into various work items and associated costs, it typically does not provide detailed labor cost breakdowns. The focus is on the value of the scheduled work, and while labor costs are a component of this, they are generally aggregated rather than itemized extensively.

  • Misconception 4: Once submitted, the Schedule of Values cannot be adjusted.

    Contrary to this belief, the SOV is a dynamic document that can and should be adjusted as the project evolves. Adjustments may be required due to changes in project scope, unforeseen conditions, or modifications to the contract. These adjustments need formal approval but are a normal part of managing a construction project.

  • Misconception 5: The total of the SOV must match the original contract amount exactly.

    While the initial SOV should indeed reflect the total contract amount, subsequent modifications to the project can cause deviations. The final value of the SOV may differ from the original contract amount due to approved changes orders, adjustments in work scope, or revisions to the project plan. It's vital that all changes are documented and approved to ensure the SOV accurately reflects the project's financial status.

Clarifying these misconceptions is crucial for the effective utilization of the Schedule of Values in managing construction projects. The SOV, when correctly understood and applied, is a powerful tool for financial management, providing clarity and transparency to project stakeholders on the financial progress and status of the work being completed.

Key takeaways

Filling out and using the Schedule of Values form (SOV) is a critical part of managing construction projects efficiently. Here are six key takeaways to consider when working with this form:

  • Accuracy is critical: Ensure every entry on the SOV, from work description to scheduled value and percentage complete, is accurate. Mistakes can lead to payment disputes, project delays, and financial discrepancies.

  • Detailed descriptions: Each item listed on the SOV requires a detailed description of the work. This clarity helps in tracking progress and facilitates clear communication between all parties involved.

  • Update regularly: The SOV is a living document that should be updated regularly to reflect the actual progress of the project. This includes updating the percentage of work completed and any changes in the work schedule.

  • Retainage handling: The form includes a section for retainage, which is a portion of the contractor’s payment withheld until the project reaches substantial completion. Understanding how to calculate and report retainage correctly is essential.

  • Material tracking: The SOV tracks both work completed and materials present on site. Accurately reporting materials ensures that payments are made for materials on site and not yet installed, protecting both the contractor and the client.

  • Contractor and manager signatures: The form must be approved and signed by both the contractor and the project manager. This formalizes the agreement on work progress and payments, providing a legal basis for future reference, should disputes arise.

The SOV is pivotal for financial transparency, project tracking, and legal protection for both contractors and project owners. By following these key practices, parties involved in a construction project can foster a smoother, more transparent financial and project management process.